AEC Engineering will be engineering, fabricating, and programming several Control Panels, and providing the specified instrumentation, as part of a large project to upgrade the wastewater treatment facility serving Hartland, ME.
AEC’s scope of work includes developing engineered AutoCAD drawings for a new Main Septage Control Panel; new Sludge Pump Control Panel; and new Hauler Operating Panel. AEC will also be performing the programming of the PLCs and providing start-up commissioning and training for operating personnel. Instruments are being provided by Ritec Corporation, a RITEC & Sullivan Associates Company. The project was designed by Olver Associates and will be implemented by Penta Corporation.


