A global manufacturer with locations in New Hampshire wanted to increase production capacity by adding new equipment. They engaged a process engineering firm to assist them and this firm in turn looked to AEC Engineering for help with the design & fabrication of the control cabinet, as well as the motor starter panels. AEC took the information provided and quickly created a drawing package for client approval. With approved drawings in hand, AEC built the control panel and motor starter panel. Close coordination was needed throughout the project to deal with customer changes and supply chain issues. In the end all parties were pleased with the outcome. Reach out today and let AEC Engineering help you with your next fabrication project.
You May Also Like
Control Panel FabricationProgrammingSystem Design
AEC Engineering is Your Innovation Partner
AEC-EngineeringApril 19, 2024
Control Panel FabricationTraining
The UL 508A Certification: Why It Is Important
AEC-EngineeringMarch 26, 2024